SAC code for works contract: 9954
GST rate 1% / 5% / 18% from 22 September 2025 (it was 18% (12% for government earthwork and offshore oil and gas works contracts) before GST 2.0). Heading 9954 covers construction of buildings and civil works and works contracts, where goods and services are supplied together to build, install, repair or renovate immovable property. Most works contracts are 18%. Under GST 2.0 the remaining 12% entries, earthwork contracts for government (and their sub-contracts) and offshore oil and gas works, moved to 18%. Promoter sales of residential flats keep their 1% and 5% rates without ITC.
At a glance
- SAC code
- 9954
- Description
- Composite supply of works contract and construction services (Heading 9954, Construction services)
- GST rate now
- 1% / 5% / 18%
- Before 22 Sep 2025
- 18% (12% for government earthwork and offshore oil and gas works contracts)
- Same-state supplier
- CGST 9% + SGST 9%
- Other-state supplier
- IGST 18%
On a ₹10,000 bill
- Taxable value
- ₹10,000.00
- CGST 9%
- ₹900.00
- SGST 9%
- ₹900.00
- Or IGST (other state)
- ₹1,800.00
- Bill total
- ₹11,800.00
Rates under 9954
| Rate | Applies to |
|---|---|
| 18% | Works contract and construction services not covered by a specific entry (item (xii)), including commercial and industrial construction |
| 18% | Works contract to Central or State Government, UT or local authority involving predominantly earth work (over 75% of value), and sub-contracts of it |
| 18% | Offshore works contract for oil and gas exploration beyond 12 nautical miles |
| 1% | Construction of affordable residential apartments by a promoter in a real estate project, without ITC |
| 5% | Construction of residential apartments other than affordable ones by a promoter, without ITC |
| 18% | Commercial apartments in a project other than a residential real estate project (item (if)) |
| 5% | Housekeeping such as plumbing or carpentry via an e-commerce operator where the supplier is not liable to register, without ITC |
When you enter the bill
- Use the 6-digit SAC by type of work: 995411-995419 buildings, 995421-995429 civil engineering, 995471-995479 finishing works such as painting and tiling.
- Government earthwork contracts and offshore oil and gas works contracts billed before 22 Sep 2025 were at 12%; from that date they are 18%.
- For promoters, the 1% and 5% rates need 80% of inputs and input services from registered suppliers; the shortfall attracts 18% under reverse charge, and cement from unregistered suppliers is under RCM at the applicable rate.
Common 6-digit codes
| Code | Description |
|---|---|
| 995411 | Construction of single or multi-dwelling residential buildings |
| 995414 | Construction of commercial buildings |
| 995413 | Construction of industrial buildings |
| 995421 | General construction of highways, streets, roads, railways |
| 995473 | Painting services |
| 995474 | Floor and wall tiling services |
On the invoice
A tax invoice shows the SAC code to 4 digits (9954) if the seller’s turnover in the previous financial year was up to ₹5 crore, and to 6 digits above that. Sellers up to ₹5 crore may leave it off bills to unregistered buyers. Notification 78/2020-Central Tax.
Source
Notification 11/2017-CT(R), S.No. 3, items (i) to (xii), as amended by 15/2025-CT(R). Checked 16 November 2026. GST rates change by notification, so check the latest one before you file, and ask your CA when a bill could fall under more than one entry.
Related codes
- Cement · HSN 252318%
- TMT bars · HSN 721418%
- Repair and maintenance services · SAC 99875% / 18%
- Steel structures · HSN 730818%
- Accounting and audit services · SAC 99822118%
- Advertising services · SAC 9983615% / 18%
- Banking and financial services · SAC 9971Nil / 18%
- Car rental with driver · SAC 9966015% / 18%
- Cleaning and housekeeping services · SAC 9985335% / 18%
- Commercial rent · SAC 99721218%
Works contract: GST questions
What is the SAC code for works contract?
9954. Composite supply of works contract and construction services (Heading 9954, Construction services).
What is the GST rate on works contract?
18% for Works contract and construction services not covered by a specific entry (item (xii)), including commercial and industrial construction; 18% for Works contract to Central or State Government, UT or local authority involving predominantly earth work (over 75% of value), and sub-contracts of it; 18% for Offshore works contract for oil and gas exploration beyond 12 nautical miles; 1% for Construction of affordable residential apartments by a promoter in a real estate project, without ITC; 5% for Construction of residential apartments other than affordable ones by a promoter, without ITC; 18% for Commercial apartments in a project other than a residential real estate project (item (if)); 5% for Housekeeping such as plumbing or carpentry via an e-commerce operator where the supplier is not liable to register, without ITC. These are the rates from 22 September 2025 (GST 2.0).
What was the GST rate on works contract before GST 2.0?
18% (12% for government earthwork and offshore oil and gas works contracts) until 21 September 2025. A bill for a supply made before 22 September 2025 can still carry the old rate.
How much GST is charged on ₹10,000 of works contract?
At 18%, GST is ₹1,800.00, so the bill totals ₹11,800.00. From a supplier in your own state that is CGST ₹900.00 + SGST ₹900.00; from another state it is IGST ₹1,800.00.
Bills with the GST already checked
TaskAutomate reads each purchase bill, checks the GSTIN, the tax split and that the rate is a real GST slab for the bill’s date, and posts it into Tally after you approve it.